Fao Pumping Station
Currently were are in the first stages of starting a mega project (Main Gas Turbine Pumps FAO Depot) with Siirtec Nigi, RuhrPumpen, SCOP and SOC. The scope of work of this project includes the following:
-
Main Oil Pump suction line from booster pump discharge tie-in point to individual pump suction flange comprising of tie-in isolation valve, individual pump suction MOVs, individual pump suction strainers and associated piping and instruments;
-
Main oil pump discharge line from individual pump discharge to Main pump discharge tie-in flange, comprising of individual pump isolation MOVs, individual pump check valves, common discharge pressure control valves with duty / standby configuration, HIPPS systems, tie-in isolation valve and associated piping and instruments.
-
Main oil pump bypass piping of each train from suction header to discharge tie-in flange, comprising of HIPPS valve and associated piping and instruments.
-
Main oil pump recycle line for each stream from individual pump recycle to recycle header tie-in flange comprising of individual recycle valve, surge relief valve and associated piping and instruments.
-
Fuel gas conditioning package comprising of knock out drum, filter coalescer, metering, gas supply heater, pressure reduction valve and associated piping;
-
Instrument air compressor package supplying instrument air requirements to turbines. The IA package is comprised of instrument air compressor, dryer package, dryer pre-filter and after-filters, Dry air receiver, final filter and associated piping;
-
Oil drain collection system to collect the oil drained during maintenance comprising of slop tank, slop tank transfer pump and associated piping and instruments;
-
Corrosion inhibitor skid comprising of storage tank, injection pump, and associated piping and instruments;
-
Fuel gas vent collection header to collect the vent gas comprising of cold vent and associated piping;
-
3 days diesel storage tank and associated piping to supply diesel to emergency generator
-
All other auxiliary systems related to this facility.
MSK IRAQ Work in Fao Pumping Station